


Learned driving planners keep being updated after deployment. ContinualDrive updates a deployed planner on real-world nuPlan logs one scenario group at a time, scores the same checkpoints in open and closed loop, makes four measurement axes explicit, and anchors a three-valued release verdict to the deployed checkpoint C0. Verdicts can reverse when one axis changes, and in the core suite no update regime measurably improved on C0 in closed loop.
Learned driving planners keep being updated after deployment as new logs arrive, yet continual learning evaluations rarely ask whether an update improves on the deployed model, and their verdicts rest on unstated evaluation choices. We present ContinualDrive, a deployment-anchored benchmark for post-deployment continual learning of driving planners. It updates a deployed planner on real-world nuPlan logs one scenario-type group at a time, evaluates the same checkpoints in open and closed loop, makes four measurement axes explicit (evaluation loop, reference checkpoint, temporal aggregation and stream protocol), and anchors a three-valued release verdict to the deployed checkpoint. We study two planners (PlanTF and Diffusion Planner) under full fine-tuning and adapter or LoRA updates, with and without replay or gradient projection, in three task orders. Verdicts can reverse or vanish when one axis changes: open-loop ADE ranks the final PlanTF model above the deployed one in half of its core-suite runs, whereas every closed-loop score ranks it below; backward transfer misses this loss, which on average is already present when each group has just been learned; and regime rankings vary far less across training seeds than across task orders. In the core suite of full and adapter updates, no regime measurably improved on the deployed planner in closed loop; on a panel more than ten times larger every evaluated final checkpoint trails it, and joint training on all groups recovers much of the loss without exceeding its nuPlan closed-loop score. We distill these findings into a reporting contract and will release the code and all checkpoints.
Five steps from a deployed planner to a release verdict. The schematic follows Fig. 1 of the paper; click a step or let it play.
Change one measurement axis at a time, starting from the deployment reading (closed loop, C0 reference, final checkpoint). Every number below is plotted in the paper (Figs. 2–4).
Pick a planner, a score and a stream setting: regimes re-rank as the reading changes. These are benchmark readings, not a leaderboard of methods — the paper proposes no new method. Bars show the change from the deployed C0 (right = better).
Core regimes, same planner and score.
@article{li2026continualdrive, title = {{ContinualDrive}: A Deployment-Anchored, Multi-Axis Benchmark for Continual Updates of Learned Driving Planners}, author = {Li, Zirui and Mao, Zhiqi and Ren, Yangang and Huang, Heye and Yang, Haohan and Huang, Qihang and Chen, Zhan and Lv, Chen}, journal = {arXiv preprint arXiv:XXXX.XXXXX}, year = {2026} }